Legally sound certification:
Free Claim CheckPPWR: EU Packaging Regulation
The PPWR has applied since 12 August 2026. It entered into force on 11 February 2025; after a transition period of 18 months it became applicable. The individual requirements arrive in stages.
Some of these are not fixed calendar dates. The design-for-recycling criteria, for example, apply from 1 January 2030 or 24 months after the corresponding delegated act enters into force, whichever is later. For companies that means the requirements are settled while the start date of individual details may move back. Plan against the earlier date: anyone who waits for the legal act has no lead time left.
The deadlines from 2030 look distant but are not. Packaging that has to reach performance grade C in 2030 is being developed, signed off and tooled today. Decisions on material, multi-layer structure, label, adhesive and ink determine the later recyclability, and tools are not replaced every year.
What is immediate is this: check whether the substance limits under Article 5 are met and evidenced, clarify the three PFAS limits where there is food contact, and build the technical documentation for the requirements that already apply. The deadlines and duties in detail are on the PPWR page.
Sources: Regulation (EU) 2025/40 (PPWR)
Editorial responsibility: Malte Biss, CEO & Founder of flustix